• Project name:

    164 Melbourne Street, South Brisbane

  • Location:

    164-170 Melbourne Street & 24-27 Manning Street, South Brisbane, QLD 4101

  • Building type:

    Multiple high-rise towers combining residential apartments, a hotel, and ground-level retail/hospitality

  • Number of levels:

    A three-tower scheme (ranging from 24 to 50 storeys, up to 207 meters high), which includes residential dwellings and a 216-room short-term/luxury hotel

  • Structural system:

    Stage 1 Basement and Podium‍ ‍

    Includes partial Basement, podium of Towers A and B

    (Indoor sports and recreation, shop, food and drink

    outlet, office), comprised of:

    a. Basement 07 to 01: Residential carparking

    5x levels and Commercial carparking 2x levels, 499

    cars;

    b. Ground: Cold shell Residential Tower A & B

    Lobbies, incl. Loading dock, Fire Control Room, and

    Substation. Retail, Commercial, Food and Beverage

    (F+B) tenancies, public domain, and precinct laneway;

    c. Mezzanine: Cold shell Retail and F+B;

    d. Level 02 to 03 (Tower A & B): Cold Shell

    Retail;

    e. Level 04:

    (Tower A) Slab/Staging Roof AHD 20.35m

    (Tower B) Cold shell Retail and retail plant;

    Stage 3 Tower A Level 04 to 26 Residential Tower ‍ ‍

    Includes a Multiple dwelling tower, comprised of:

    a. Level 04 to 22: Residential, 114x apartments, incl. 38x 2 Beds & 76x 3 Beds;

    b. Level 23 and 25: Services/Plant;

    c. Level 24: Roof Top Residential facilities/ Amenities;

    d. Level 25: Roof/ Lift over-run;

    e. Level 26: Lift Motor Room roof;

    f. Total height AHD 98.2m.

    Stage 4 Tower B Level 05 to 40 Residential Tower

    Includes a Multiple dwelling tower, comprised of:

    a. Level 5 to 36: Residential, 231x apartments, incl. 18x 1 Beds, 69x 2 Beds, 141x 3 Beds, 2x 4

    Beds and 1x 6 Beds;

    b. Level 37 and 40: Services/Plant;

    c. Level 38 and 39: Residential Roof Top facilities/ Amenities;

    d. Level 40: Roof

    e. Total height AHD 150.20m.

  • Services provided:

    Design and modelling for Stages 1, 3 and 4, comprising:

    • Determination and specification of applicable load cases and load combinations, including imposed, dead, wind, seismic and construction loads where relevant.

    • Calculation of load paths and run-down (tributary) load distributions to structural elements.

    • Finite-element and frame modelling and analysis using RAM Concept and RAPT to verify member actions and slab behaviour.

    • Development of design solutions for reinforced and post-tensioned concrete and steel members in accordance with applicable codes and project requirements.

    • Independent spreadsheet-based calculation checks (Excel) validating software results and key design assumptions.

    • Production of detailed mark-ups and annotations for drafting and documentation of design intent.

  • Key engineering challenges:

    Designing efficient load-transfer systems in multi-storey post-tensioned concrete buildings where complex load paths, differential long-term deformations, and construction sequencing interact.

    Why it matters

    • Incorrectly accounted-for load paths or incompatible deformation behaviour can lead to excessive cracking, serviceability problems (uneven floors, ponding), redistribution of forces that overload secondary elements, and costly remedial works.

    • Multi-storey and mixed-material structures amplify these risks because stiffness contrasts, differential creep and shrinkage, and variable connection detailing change how loads flow through the structure over time.

    Primary factors to address

    • Complex load paths: transfer of gravity, lateral (wind/seismic) and concentrated loads through slabs, beams, columns, cores and transfer levels; consideration of torsion and eccentricity at setbacks or openings.

    • Time-dependent behaviour: creep, shrinkage and relaxation in post-tensioned and reinforced concrete affecting long-term camber, stress in tendons and redistribution of moments.

    • Construction sequencing and staged loading: temporary load cases, propping removal, progressive prestress installation and interaction with partially completed elements.

    • Differential stiffness and movement: connections between concrete and steel, superstructure over transfer slabs, and transitions between piled and pad foundations.

    • Serviceability limits: control of deflections, vibration, cracking and water ponding, often governing design more than ultimate capacity.

    • Detailing and durability: anchorage zones, reinforcement congestion at transfer regions, corrosion protection and maintainability in congested nodes.

    • Analysis modelling: need for robust 3D finite element models, staged construction analysis, and sensitivity checks to material parameter uncertainty.

    • Load combinations and robustness: ensuring redundancy so local failures or construction errors do not lead to progressive collapse.

    Mitigation strategies

    • Early integrated design: coordinate architectural openings, mechanical services and façade loads to simplify load paths.

    • Stage-aware modelling: perform staged construction analyses with realistic creep, shrinkage and tendon relaxation models; check multiple sequencing scenarios.

    • Conservative serviceability checks: limit deflection and crack widths for long-term performance; design for worst-case losses in post-tensioned systems.

    • Detailing for transfer: provide adequate reinforcement continuity, dowels and shear transfer mechanisms; avoid excessive congestion; use high-capacity anchors and bearing pads where needed.

    • Interface design: include movement joints, bearing arrangements and slip-critical connections between different materials to accommodate differential movement.

    • Quality control in construction: strict control of tendon stressing, concrete curing, tolerances and temporary works; monitoring during construction (deflection and strain) to validate assumptions.

    • Redundancy and robustness: design alternative load paths, capacity in key members and ductile detailing in potential plastic zones.

    Key checks and deliverables

    • 3D structural model with staged construction sequences and time-dependent material properties.

    • Detailed transfer-level design drawings and reinforcement schedules.

    • Serviceability report covering long-term deflection, cracking and vibration criteria.

    • Construction monitoring plan (deflection, tendon losses, strain gauges) and acceptance criteria.

    • Risk register with sequencing and connection failure modes and mitigation measures.

    Outcome objective Achieve a structurally efficient, durable and robust multi-storey post-tensioned building where load transfer and long-term deformations are controlled to meet safety, serviceability and constructability requirements while minimising cost and remedial risk.

    Key engineering solutions

    1. Structural concept and system selection

    • Developed a hybrid structural system to balance span, floor-to-floor height and cost: post-tensioned flat slab for larger open-plan areas, reinforced concrete beams and columns for service cores and stairs, and structural steel framing for long-span/commercial zones.

    • Optimised load paths and lateral resistance strategy using a combination of reinforced concrete shear cores and braced steel frames where required to meet drift and seismic considerations.

    • Coordinated early with architect and services engineers to minimise clashes, reduce ceiling voids and avoid excessive slab depths.

    1. Floor systems and slab design

    • Post-tensioned flat slab design for podium and upper-storey office/retail areas to achieve long spans with reduced slab thickness and smaller drop heights, improving net lettable area and mechanical services integration.

    • Conventional reinforced concrete slab and beam system for smaller spans and high-load areas (plant rooms, heavy equipment bases).

    • Design included camber control, deflection criteria, and fatigue checks where dynamic or repetitive loading was expected.

    Value outcomes

    • Reduced overall structural depth and floor-to-floor heights in key areas, increasing usable floor area and lowering façade and service costs.

    • Construction programme efficiencies through adoption of post-tensioned slabs and prefabricated steel where suitable.

    • Robust durability and lifecycle performance achieving lower whole-of-life maintenance costs.

    • Clear documentation and active site support minimised construction risk and change costs.

  • Selected career experience before establishing ECSEC, this project experience of the senior engineer gained during previous employment. The project was not delivered under the ECSEC appointment.

Two high-rise buildings under construction in an urban area with a city skyline in the background
Diagram of a multi-stage building construction project, with sections labeled Stage 1 in green at the base, Stage 3 in orange above it, and Stage 4 in pink at the top, with some sections marked as subject to further approval.
A digital 3D model of a high-rise building, part of the Melbourne Street Towers development, showing multiple floors and structural details.
A 3D architectural model of a building or structure, likely a political or public space, with the foundation supported by stilts or columns, and multiple levels and rooms visible on the top floors.
Modern multi-story building with pink and brick exterior, featuring balconies, large windows, and a courtyard with plants and trees.